Industry · Structures · MRO · tier suppliers

Aerospace

A structural change late in a programme must stay traceable from requirement to 3D model, stress report and NC program. Each broken link means rework and delayed certification evidence.

Illustrative engineering scenario

Machined wing rib for a regional-aircraft wing box

A structural change late in a programme must stay traceable from requirement to 3D model, stress report and NC program. Each broken link means rework and delayed certification evidence.

  • Requirement-to-verification traceability for certification evidence
  • One controlled product structure with full revision and change history
  • Design, analysis and NC programming from the same 3D model
Integrated workflow · select a stage
WB-100 Wing box · RIB-03Polarion ALMConceptual 3D model · DTS illustration, not a customer project
REQ-STR-112 · limit load 2.5 g
REQ-MAT-031 · Al 7050-T7451
REQ-MFG-008 · min. web 2.0 mm
drag to orbit
Requirements · wing rib R3Polarion · baseline 2.1
IDRequirementVerifyStatus
REQ-STR-112Carry limit load at 2.5 g without yieldAnalysisApproved
REQ-STR-118No buckling below ultimate loadAnalysisApproved
REQ-MAT-031Al 7050-T7451 plate to AMS 4050InspectApproved
REQ-MFG-008Minimum web thickness 2.0 mmInspectIn review
CONCEPTUAL VIEW · NOT A PRODUCT SCREENSHOT · SAMPLE DATA

Contact us

Tell us about your product and process. The DTS team will reply with a practical next step: a demo, an assessment or a training plan.